Valve is the most common equipment in chemical enterprises. It seems easy to install the valve, but if it is not executed according to the relevant technology, safety accidents will occur

Valves are the most common equipment in chemical enterprises. It seems easy to install valves, but if they are not executed in accordance with relevant technologies, safety accidents will occur...

No-no 1

Hydrostatic test was carried out under negative temperature in winter.
Consequence: the tube freezes quickly during the hydrostatic test, causing the tube to freeze.
Measures: water pressure test should be carried out as far as possible before winter application, and the water should be blown clean after pressure test, especially the water in the valve must be cleared in the clean, otherwise the valve will be light rust, heavy freeze crack.
During the hydrostatic test in winter, the project must be carried out at a positive indoor temperature and the water must be blown clean after the pressure test.

No-no 2

The pipeline system is not flushed carefully before completion, and the flow rate and speed cannot meet the requirements of pipeline flushing.
Water pressure strength test was even used instead of flushing.
Consequences: The water quality does not meet the operation requirements of the pipeline system, which often leads to the reduction or blockage of the pipeline cross section.
Measure: Flush with the maximum flow rate or flow rate not less than 3m/s.The water color and transparency of the discharge outlet should be consistent with the visual measurement of the water color and transparency of the inlet.


No-no 3

Sewage, rainwater and condensate pipes shall be concealed without water closing test.
Consequences: may cause water leakage, and cause user losses.
Measures: The closed water test should be checked and accepted strictly according to the standard.Underground installation, ceiling, pipe and other hidden sewage, rainwater, condensate pipe to ensure that no leakage.

No-no 4

In the water pressure strength test and tightness test of pipeline system, only observe the change of pressure value and water level, and the inspection of leakage is not enough.
Consequences: Leakage occurs after the operation of the pipeline system, which affects the normal use.
Measures: When the piping system is tested in accordance with the design requirements and construction specifications, the pressure value or water level changes shall be recorded within the specified time, and in particular, the leakage shall be carefully checked.

No-no 5

Butterfly valve flanges use ordinary valve flanges.
Consequence: butterfly valve flange and the general valve flange size is not the same, some flange diameter is small, and butterfly valve disc is large, resulting in not open or hard to open the valve damage.
Measures: according to the actual size of the butterfly valve flange flange processing flange.

No-no 6

In the construction of the building structure, there are no reserved holes and embedded parts, or the reserved holes are too small in size and the embedded parts are not marked.
Consequence: in the construction of warm sanitation project, picking out the building structure, or even cutting off the reinforced bar, affecting the safety performance of the building.
Measures: Be familiar with the construction drawings of heating and sanitation project, and actively and seriously cooperate with the construction of reserved holes and embedded parts according to the installation requirements of pipes, supports and hangers, and refer to the design requirements and construction specifications for details.

No-no 7

During pipeline welding, the wrong opening of the pipe after the opposite port is not in a center line, no clearance is left for the opposite port, no groove is removed for the thick-wall pipe, and the width and height of the welding seam do not meet the requirements of the construction code.
Consequence: the wrong orifice of the pipe is not in a center line, which directly affects the welding quality and perception quality.No clearance is left for the counterpart, no slotting is done for the thick-walled pipe, and the welding strength cannot be reached if the width and height of the welding seam do not meet the requirements.
Measures: After welding the pipe to the other side, the pipe should be on the center line instead of the other side.A gap should be left at the opposite mouth;Thick - walled pipes should be slotted.In addition, the width and height of the weld shall be welded in accordance with the requirements of the code.

No-no 8

Pipelines are directly buried in frozen soil and untreated loose soil, and the piers are not properly spaced and located, or even in the form of dry code bricks.
Consequence: The pipe was damaged in the process of compaction of backfill earth due to unstable support, which caused rework and repair.
Measures: The pipe shall not be buried in frozen soil and loose soil without treatment. The distance between piers shall meet the requirements of construction code, and the supporting pad shall be firm. In particular, the pipe connection shall not bear shear force.Brick piers to use cement mortar masonry, ensure integrity, firm.

No-no 9

The material of the expansion bolts for fixing the pipe bracket is inferior, the aperture of the installation expansion bolts is too large or the expansion bolts are installed on the brick wall or even the light wall.
Consequences: Loose pipe support, pipe deformation, and even fall off.
Measures: qualified products must be selected for expansion bolts. If necessary, samples should be taken for test inspection. The diameter of expansion bolts installed should not be 2mm larger than the outside diameter of expansion bolts.

No-no 10

Flanges and gaskets for pipe connections are not strong enough, and the connecting bolts are short or thin in diameter.Rubber pads are used for heat pipes, double or bevel pads for cold water pipes, and flange gaskets protruding into the pipes.
Consequence: flange connection is not tight, even damaged, leakage phenomenon.The penetration of the flange gasket into the tube will increase the flow resistance.
Measures: flanges and gaskets used in pipelines must meet the requirements of working pressure in pipeline design.
Rubber asbestos gaskets should be used for flange gaskets of heating and hot water supply pipes;Rubber gasket should be used for flange gasket of water supply and drainage pipeline.
The gasket of the flange shall not protrude into the tube, and the outer circle to the flange bolt hole shall be appropriate.Bevel pads or several gaskets shall not be placed in the middle of the flange. The diameter of the bolt connecting the flange should be less than 2mm than the diameter of the flange flange. The length of the bolt protruding nut should be 1/2 of the thickness of the nut.

No-no 11

Incorrect valve installation method.
For example, the water (steam) flow of globe valves or check valves is opposite to the sign, the stem is installed downward, horizontal check valves are installed vertically, the handle of rising stem gate valve or butterfly valve has no open and closed space, the stem of hidden valve is not oriented toward the inspection door.Consequences: valve failure, switch maintenance difficulties, valve stem down often cause water leakage.
Measures: Install in strict accordance with the valve installation instructions, keep the stem of the rising gate valve open height, fully consider the rotation space of the butterfly valve handle, all kinds of valve stem should not be lower than the horizontal position, let alone down.The hidden valve should not only set the inspection door to meet the needs of opening and closing the valve, but also the stem should face the inspection door.

No-no 12

The installation valve specifications and models do not meet the design requirements.
For example, the nominal valve pressure is less than the system test pressure;When the diameter of water supply branch pipe is less than or equal to 50mm, use gate valve;Cut-off valves are used in the dry and riser pipes for hot water heating.Butterfly valve is used for water suction pipe of fire pump.
Consequences: Affect the valve normal open and close and adjust resistance, pressure and other functions.Even caused damage to the valve during the operation of the system and forced repair.
Measures: Familiar with the application range of all kinds of valves, according to the design requirements to choose the valve specifications and models.Nominal valve pressure to meet the requirements of system test pressure.According to the requirements of the construction code: cut-off valve shall be used for the water supply branch pipe diameter less than or equal to 50mm;Gate valves should be used when pipe diameter is greater than 50mm.Hot water heating dry, vertical control valve should be used gate valve, fire water pump suction pipe should not be used butterfly valve.

No-no 13

The valve does not perform necessary quality inspection before installation.
Consequences: In the operation of the system, the valve switch is not flexible, the shutdown is not strict and the phenomenon of leakage (steam) occurs, causing rework and repair, and even affecting the normal water supply (steam).
Measure: Before installation, the valve should be tested for compressive strength and tightness.The quantity of each batch (same brand, same specification, same model) shall be randomly checked by 10% and not less than one.The strength and tightness test should be done one by one for the closed - circuit valve installed on the main pipe.The strength and tightness test pressure of the valve should comply with the "Construction Quality Acceptance Code for Building Water Supply, Drainage and Heating Engineering" (GB 50242-2002).

No-no 14

The main materials, equipment and products used in the construction are in lack of technical and quality appraisal documents or product certificates conforming to the current national or ministry standards.
Consequences: the project quality is not qualified, there are potential accidents, can not be delivered to use on schedule, must be reworked and repaired;Delay of construction, increase of manpower and material input.
Measures: The main materials, equipment and products used in water supply and drainage and heating and sanitation engineering shall meet the technical and quality identification documents or product qualification certificates issued by the state or the Ministry;The product name, model, specification, national quality standard code, date of manufacture, name and place of manufacturer, inspection certificate or code of the ex-factory product shall be indicated.

No-no 15

The valve inversion
Consequences: Check valve, throttle valve, pressure reducing valve, check valve and other valves have directionality, if installed in reverse, throttle valve will affect the service effect and life;Pressure relief valves do not work and check valves can be dangerous.
Measures: General valves, direction marks on the body;In case of no, the valve should be correctly identified according to the working principle.The valve chamber of the globe valve is asymmetrical, the fluid should be let from the bottom to the top through the valve mouth, so that the fluid resistance is small (determined by the shape), open to save effort (due to the medium pressure up), closed after the medium does not pressure packing, easy to repair.This is why the globe valve cannot be reversed.
Gate valves should not be inverted (i.e., handwheel down), as this can cause media to remain in the cover space for a long time, corrode the stem, and is No- No to certain process requirements.It is inconvenient to change packing at the same time.
Open stem gate valves should not be installed underground or the exposed stem may corrode due to moisture.
Lifting type check valve, when the installation to ensure that its disc vertical, in order to lift flexible.
Swing check valve, install to ensure its pin shaft level, so that the swing flexible.
Pressure relief valves should be installed upright in a horizontal pipe line, do not tilt in all directions.

No-no 16

Manual valve opening and closing, too much force
Consequences: light valve damage, serious safety accidents
Measure: The manual valve, its handwheel or handle, is designed according to ordinary manpower, taking into account the strength of the sealing surface and the necessary closing force.So you can't use a long lever or a long plank to move the plank.Some people are used to using the board hand, should be strict attention, do not exert too much force, otherwise easy to damage the sealing surface, or plate broken handwheel, handle.Open and close the valve, the force should be smooth, not impact.Some impact open and close high pressure valve components have been considered the impact and the general valve can not wait.For the steam valve, before opening, should be pre-heated, and exclude condensate, open, should be as slow as possible, so as not to occur water hammer phenomenon.When the valve is fully open, the handwheel should be reversed a little, so as to tighten between threads, so as not to loosen and damage.For open stem valves, remember stem positions when fully open and fully closed to avoid hitting the upper dead center when fully open.It is convenient to check whether it is normal when closed.If the valve does fall off, or between the valve core seal embedded larger debris, when the valve stem position is about to change.When the pipeline is first used, there are a lot of internal dirt, the valve can be slightly opened, using the high-speed flow of the medium, wash it away, and then gently closed (can not close quickly, violently closed, in case of residual impurities caught in the sealing cover), open again, so repeated many times, clean the dirt, then put into the normal work.Often open the valve, sealing surface may be sticky with dirt, when closed, also want to use the above method to flush clean, and then formally close.If the handwheel or handle is damaged or lost, it should be fitted immediately, and can not be replaced by the movable plate hand, so as to avoid damage to the valve stem square, not open and close properly, so as to cause accidents in production.Some media, cooled after the valve closed, so that the valve parts shrink, the operator should be closed at the appropriate time again, so that the sealing surface without fine seam, otherwise, the medium from the fine seam high-speed flow, it is easy to erosion sealing surface.During the operation, if the operation is found to be too strenuous, the reason should be analyzed.If packing is too tight, loosen appropriately. If stem is askew, advise repair.Some valves, in the closed state, the closure of the thermal expansion, causing difficulty in opening;If it must be opened at this time, unscrew the bonnet half to one turn to eliminate stem stress and then turn the plate.

No-no 17

Improper installation of valve in high temperature environment
Consequences: Causing a spill
Measures: The high-temperature valve above 200℃ is at room temperature when installed, but after normal use, the temperature rises, the bolt expands in heat, the gap increases, so it must be tightened again, called "hot tight", the operator should pay attention to this work, otherwise it is easy to leak.

No-no 18

Cold weather does not drain in time
Measures: when the weather is cold, the water valve should be closed for a long time, the water should be removed after the valve.After the steam valve stops steam, condensate should also be removed.The bottom of the valve is like a silk plug, it can be opened to drain.

No-no 19

Nonmetal valve with too much opening and closing force
Measure: nonmetal valve, some hard and brittle, some low strength, operation, open and close force can not be too big, especially can not make strong.Also be careful not to bump objects.

No-no 20

The new valve packing is too tight
Measures: when the new valve is used, the packing should not be pressed too tight, with no leakage as a degree, so as not to pressure the valve stem is too big, speed up the wear and tear, and open and close laboriously.The quality of valve installation directly affects use, so careful attention must be paid to valve direction and position, valve construction, valve protection, bypasses and instrumentation, and valve packing replacement.

No-no 21

The installation position has no operating space
Measures: the valve installation position must be convenient for operation;Even if the installation is temporarily difficult, the operator's long-term work should be considered.Best valve handwheel and chest even (generally 1.2 meters away from the operation floor), so, open and close the valve more energy saving.Landing valve hand wheel should be up, do not tilt, so as not to operate awkwardly.The wall machine depends on the valve of the equipment, also want to leave room for the operator to stand.To avoid relying on the sky operation, especially acid and alkali, toxic medium, otherwise very unsafe.

No-no 22

Hit a valve made of brittle material
Measures: installation and construction must be careful, do not hit the valve made of brittle materials.Before installation, check the valve to see if there is any damage, especially to the stem.Also turn a few times to see if the valve is skewed, because during transportation, the most prone to skew valve stem.Also remove debris from the valve.When the valve is hoisted, the rope should not be tied to the handwheel or stem to avoid damaging these parts. It should be tied to the flange.Be sure to clean the line to which the valve is attached.Iron oxide chips, sand, welding slag and other sundries can be blown by compressed air.These sundries, not only easy to scratch the sealing surface of the valve, including large particles sundries (such as welding slag), but also can block the small valve, make its failure.When installing the screw valve, the sealing filler (wire and lead oil or polytetrafluoroethylene raw material belt) should be wrapped on the pipe thread, do not get into the valve, in order to avoid the memory of the valve, affect the medium flow.When installing flanged valves, pay attention to tighten bolts symmetrically and evenly.Valve flange and pipe flange must be parallel, reasonable clearance, to avoid valve too much pressure, or even cracking.Particular attention should be paid to brittle materials and low strength valves.The valve to be welded with the pipe should be spot-welded first, then fully open the closed parts, and then welded dead.

No-no 23

The valve is not insulated and cooled
Action: Some valves also require external protection, which is insulation and cooling.Steam lines are sometimes added to heat insulation.
What kind of valves should be insulated or cooled depends on production requirements.In principle, where the valve medium to reduce the temperature is too much, will affect the production efficiency or freeze damaged valve, the need for insulation, or even heat;Where the valve bare, adverse to production or cause frost and other adverse phenomena, the need to keep cold.Insulation materials include asbestos, slag wool, glass wool, perlite, diatomite, vermiculite, etc.Keep cold material to have cork, perlite, foam, plastic.

No-no 24

Bypass not installed on trap
Measures: Some valves, in addition to the necessary protection facilities, also have bypasses and instrumentation.Bypass is installed to facilitate maintenance of the trap.Other valves may also be bypassed.Bypass installation depends on valve condition, importance, and production requirements.

No-no 25

Packing not replaced regularly
Measures: inventory valve, some packing is not good, and some with the use of media, it is necessary to replace the packing.
The valve faces thousands of different media, packing box is always filled with ordinary packing, but when used, must let the packing and the medium to adapt.
When changing packing, press in round by round.The seams of each ring shall be 45 degrees, and the joints of the rings and rings shall be staggered 180 degrees.The height of the packing shall allow for further compaction of the gland and, at the present time, the proper depth of the packing chamber at the lower gland, normally 10-20% of the total depth of the packing chamber.
For high demand valves, seam Angle is 30 degrees.The seam between the loops is staggered by 120 degrees.
In addition to the packing, can also according to the specific situation, USES the rubber o-ring (natural rubber resistant to 60 degrees Celsius under weak base, butyl eyes below 80 degrees Celsius oil resistant rubber, fluorine rubber resistance to a variety of corrosive medium under 150 degrees Celsius) three fold type teflon ring (below 200 degrees Celsius) strong corrosive medium resistance of nylon bowl ring (below 120 degrees Celsius, ammonia alkali resistant) forming filler.A layer of polytetrafluoroethylene raw material belt outside the common asbestos packing can improve the sealing effect and reduce the electrochemical corrosion of the valve stem.
When pressing the packing, turn the stem simultaneously to keep all sides even and prevent too much dead, tighten the gland evenly without tilting.


主站蜘蛛池模板: 日本高清成人免费播放_中文乱码字幕在线中文乱码_成人一级毛片_一区二区成人在线_欧美一区二区三区在线观看视频_欧美一级二级视频_三级a做爰一女二男视频_少妇极品熟妇人妻 | 国产又黄又粗又爽又色的视频_亚洲视频在线不卡_国产a区b区_夜色99_曰韩精品一区二区_亚洲乱码国产乱码精品精软件_亚洲国产日韩一区二区三区_在线观看美女黄视频 | 亚洲欧美日本国产不卡_久久99精品久久久久_色蜜桃网_欧美一级片网站_国产精品区一区二区三_日日噜噜噜夜夜爽爽狠狠视频97_欧美在线一区二区_日本少妇重口xxxx | 日韩精品视频在线一区二区三区_欧美丰满老妇熟乱xxxxyyy_四虎影视国产精品永久在线_精品自拍av_久久99国产亚洲高清观看首页_五月色夜婷婷丁香琪琪_无码少妇一区二区三区浪潮AV_全黄特一级 | 中文字幕一区二区不卡_狠狠色网站_四虎成人永久在线精品免费_日本xxxwww免费视频_久操国产_一区二区三区在线观看视频_99tv成人影院_av片在线免费 | 一级片影视_精品视频一二区_色哟哟亚洲精品一区二区_日韩深夜激情爽片_国产乱子伦一区二区三区四区五区_国产高清自产拍av在线_三个黑人互换着躁我一个_国产精品精品推荐第一页 | 红杏一区二区三区_午夜理论片yy6080私人影院_少妇被爽到高潮喷水久久欧美精品_久久国产精品色av免费看_久久瑟瑟_99热这里只有精品免费_久久艹艹艹_好色一区 | 亚洲av无码专区青青草原_亚洲性射射_欧美乱子伦XXXX12在线_亚洲AV无码精品色午夜果冻_91精品国产综合久久久蜜臀图片_非她不可短剧免费观看_国产精品人成在线播放新网站_av一区二区免费 | 欧美午夜剧场特大黄三级性片片免费_又黄又爽吃奶视频在线观看_秋霞人成在线观看免费视频_免费一级片观看_91高清网站_亚洲视频久久久久_黄色国产一级_古惑仔第一部 | 二区三区精品_中文字字幕人妻中文_一级免费a一片_黄色影片在线免费观看_欧美x亚洲_成人片免费网站_wwww.8888久久爱站网_国产亚洲精品久久久999蜜臀 | 国产极品在线视频_不卡日韩_高潮到不停喷水的免费视频_欧美人妇做爰XXXⅩ性高_日本欧美久久久久免费播放网_国产网曝门99视频在线看_成人在线视频中文字幕_国产精品视频一区牛牛视频 | 91女神在线观看_国产精品激情久久久久久久_精品国产欧美_日日干夜夜操高清视频_成人avav_日韩经典一区二区_成人在线观看一区二区_日产一级片 | 久久精品人妻中文系列_国产又爽又大又黄A片图片_久久久久久久影视_欧美一区二区三区成人精品_欧美精品一区二区三区久久_亚洲精品91天天久久人人_91视视频在线观看入口直接观看_老妇xxxxx | 邻居少妇人妻互换_天天插日日插_91九色磁力_91tv最新地址入口_免费无人区男男码卡二卡_久久精品国产欧美日韩_扒开美女内裤狂揉下部_日本无限资源 | 国产精品美女久久久婷婷网站_久欠精品国国产99国产精2021_国产精品久久久久久久久果冻传媒_去看片在线_国产一级淫片a级在线播放_日本91av视频_欧美女优一区_野花视频最新免费完整在线观看 | 国产乱码久久久久_亚洲欧洲日韩国内高清_久99久在线观看_97中文字幕第二十二页_熟女熟妇人妻在线视频_成年女人色毛片_一区二区三区片_国产成人A亚洲精V品无码 | 精品久久久久久中文字幕一区二区_亚洲国产五月综合网_97影院午夜伦不卡_综合色在线_国产99视频精品免费视频76_久久官网_久久无吗视频_国产免费高清视频在线一区二区 | 四虎在线免费观看_精品久久久亚洲_亚洲国产精品久久久久婷蜜芽_麻豆网在线观看_中国一级黄色毛片_久久综合久久鬼色_中文字幕在线_国产精品久久久久一区二区三区 | 九一亚洲_日韩区欧美区_亚洲AV无码一区东京热不卡_免费观看在线毛片_亚洲一区二三区好的精华液_国产丰满果冻videossex_日本不卡不码高清视频_欧美a免费 | 国产一级网_亚洲av成人无码天堂_CHINA丰满人妻VIDEOSHD_国产黄色a级毛片_日本午夜免费_国产男女做爰高清全过小说_日本免费二区三区_日韩在线观看视频一区二区 | 亚洲av久播在线播放_亚洲国产精品精_久久国产日韩精华液的功效_亚韩无码一区二区在线视频_嫩模被啪的呻吟不断_久久久国产一区二区三区四区小说_亚洲一区二区三区乱码在线欧洲_4hu最新网 | 欧美在线视频一区_日本精品一区二区三区在线播放_日本熟妇人妻xxxx_又色又爽美女网站_亚洲AV无码成人精品区一区_做暖暖小视频免费xo_军人野外吮她的花蒂无码视频_亚洲中文字幕无码人在线 | 成午夜精品一区二区三区_四虎精品国产永久在线观看_日韩女人一级_久久综合给合久久狠狠狠色97_日韩欧美精品一中文字幕_97碰碰碰人妻无码视频_国产熟妇搡BBBB搡BBBB_91久久99久久91熟女精品 | 美国一级欧美三级_久热精品免费视频_真实的国产乱ⅹxxx66v_免费精品国产自产拍在线观看图片_a中文在线_年轻的少妇做a_午夜影院0606_99成人精品 | 又黄又爽的成人免费视频_caopeng在线_国产精品自在线_亚洲精品美女久久久久久久久久_久久久久久国产精品免费_中国wwwxxxx_精品国产天堂_成年女人午夜毛片免费视频 | av成人免费在线_色在线视频网站_国产ts视频_国内xxxx乱子另类_久久综合草_无码欧美熟妇人妻影院_九九热久久99国产盗摄蜜臀_色资源av | 人人妻人人妻人人妻碰碰_国产精品免费一级在线观看_亚洲色无码中文字幕YY51999_亚洲综合二_狠狠躁夜夜躁人人爽天天不卡_亚洲综合日韩中文字幕_国产精品福利啪在线观看_伊人久综合 | 欧一区二区三区_色婷婷狠狠久久综合五月_国产国产成人久久精品_国产ts一区_日本一区二区三区乱码_狠狠操导航_国内黄色网址_久久久久亚洲精品国产 | 国产精品一区波多野结衣_超碰成人在线免费_少妇荡乳情欲办公室456视频_国内精品老年人视频网站_韩国黄色一级毛片_亚洲欧美日韩国产综合精品_黄色av视频_精品一区二区三区的国产在线观看 | 中文无码vr最新无码av专区_成人A片色情免费观看_成人无码网WWW在线观看_精品久久久久一区二区_欧美大奶在线_成年人免费小视频_免费人成在线观看视频高潮_欧美大片aaa | 色综合中文字幕第二页_亚洲高清无在线码_国产超碰人人做人人爽Av_亚洲一区中文字幕在线观看_91网站免费观看_亚洲第一伊人_亚洲四区在线_AV无码人妻中文字幕 | 麻豆911传媒_99在线精品视频在线观看_人人九九精_天天操天天射综合_特黄一毛二片一毛片_国产精品多久久久久久情趣酒店_久久综合给合综合久久_91久久精品亚洲中文字幕无码 | 四虎2023_欧美大片aaaaa免费观看_久久精品国产69国产精品亚洲_亚洲夜夜操_日本性视频在线_97香蕉超级碰碰久久免费软件_毛片中文_日本aⅴ写真网站免费 | 亚洲夜夜性无码_国产欧美日韩久久久久_亚洲无嘛_成人你懂的_久久视频在线_成人美女视频免费_国产精品老熟女露脸视频_精品亚洲成a人无码成a在线观看 | 四虎在线免费观看_精品久久久亚洲_亚洲国产精品久久久久婷蜜芽_麻豆网在线观看_中国一级黄色毛片_久久综合久久鬼色_中文字幕在线_国产精品久久久久一区二区三区 | 九九热九九_日韩精品一区二区三区九九_热久久思思_精品人妻系列无码一区二区三区_超碰福利在线_成人免费视频观看视频_免费无码黄动漫在线观看_欧美一区在线观看视频 | 中文一级毛片_无码高潮少妇毛多水多水_亚洲AV成人片色在线观看吉沢_亚洲精品精华液一区二区_亚洲无线一二三四区手机_国产性生交XXXXX无码_人妻被中出不敢呻吟A片视频_玖玖资源站亚洲最大的网站 | 总裁与秘书高h肉_中文精品久久久久鬼色_日韩精品无码专区免费播放_国产古装全黄A级视频_青苹果乐园高清免费看_不卡国产一区二区三区四区_国产日产欧产精品精品ai_在线免费色 | 女人被躁到高潮嗷嗷叫游戏_台湾av在线播放_亚洲欧美高清视频_在线中文字幕不卡_日本亲子乱子伦xxxx30路_亚洲无线卡一卡二_亚洲v区_在线精品国产欧美 | 免费观看AV在线网站网址_国产精品国产三级国产普通_伊人久久婷婷_中文成人无字幕乱码精品区_国产在线看片免费人成视频_久久无码人妻一区二区三区_日韩3区_成人wwxx视频免费男女 | 51VV宅男天堂_日本69xxxxx_日本免费一区二区在线观看_五级日本片全部免费_亚洲高清免费_69av在线免费观看_成人免费大全_999精品视频这里只有精品 |